FAQs
More FAQs- How long will it take to have my floors coated with acrylic?
- Does urethane have an odour during application?
- Do I need to do anything prior to the technician arriving for my scheduled tile and grout cleaning service?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
Urethane finish contains no VOCs or solvents, which are often the source of odour and even harmful fumes. Urethane finish has a very light, almost unnoticeable, clean scent.
Simply pick up items on the floor, such as rugs, plants and trash cans, as well as sweep or vacuum the area to be cleaned.